1.A can do a piece of work in 4
hours; B and C together can do it in 3 hours, while A and C together can do
it in 2 hours. How long will B alone take to do it?
|
||||||||
|
2.A can finish a work in 18 days
and B can do the same work in 15 days. B worked for 10 days and left the job.
In how many days, A alone can finish the remaining work?
|
|||||||||||
|
3.10 women can complete a work in 7 days and 10
children take 14 days to complete the work. How many days will 5 women and 10
children take to complete the work?
|
||||||||
|
4.Ravi and Kumar are working on an assignment.
Ravi takes 6 hours to type 32 pages on a computer, while Kumar takes 5 hours
to type 40 pages. How much time will they take, working together on two
different computers to type an assignment of 110 pages?
|
||||||||
|
5.Sakshi can do a piece of work in 20 days.
Tanya is 25% more efficient than Sakshi. The number of days taken by Tanya to
do the same piece of work is:
|
||||||||
|
6.A takes twice as much time as B or thrice as
much time as C to finish a piece of work. Working together, they can finish
the work in 2 days. B can do the work alone in:
|
||||||||
|
7.A can lay railway track between two given
stations in 16 days and B can do the same job in 12 days. With help of C,
they did the job in 4 days only. Then, C alone can do the job in:
|
||||||||||||||||||||
|
8.A
and B can together complete a piece of work in 4 days. If A alone can complete
the same work in 12 days, in how many days can B alone complete that work ?
A.4 days B.5 days
.
C.6 days D. 7 days
9.A
does a work in 10 days and B does the same work in 15 days. In how many days
they together will do the same work ?
A.5 days B. 6 days
C.7 days D. 8 days
10.A & B working alone can do a work in 9 and 12 days
respectavily. If they work for a day alternately, A beginning, in how many days
the work will be completed?
A.10 ¼ days B. 10 ½ days
C.10 1/3 days D.10 1/6 days
11. A alone can complete a work in 16 days and B alone can do in 12 days. Starting with A, they work on alternate days. The total work will be completed in
A.
13 ¼
days B. 13 ½
days
C. 13 ¾ days D. 13 4/4 days
12.Two pipes can fill a tank in 20
and 24 minutes respectively and a waste pipe can empty 3 gallons per minute.
All the three pipes working together can fill the tank in 15 minutes. The
capacity of the tank in gallons is
|
A.
|
100 B.110
|
|
C.
|
120 D.140
|
|
13.Due to hole at the bottom of the tank, a tap takes 2 more minutes to completely fill the tank. Due to leakage of water through this hole, a bucket filled completely with water gets emptied in 4 minutes. In how much time can the tap fill the tank, if there was no hole at the bottom at the tank?
A.8
min B. 2min
C. 4
min D. 6 min
14.A red light flashes 3 times per minute and a green light flashes 5 times in two minutes at regular intervals. If both lights start flashing at the same time, how many times do they flash together in each hour? |
A.
|
30
|
|
B.
|
29
|
|
C.
|
31
|
|
D.
|
32
|
|
15.Ram, who is half as efficient
as Krish, will take 24 days to complete a work if he worked alone. If Ram and
Krish worked together, how many days will they take to complete the work?
| ||
A.
|
16
|
|
B.
|
12
|
|
C.
|
8
|
|
D.
|
18
|